Phosphate Mine


Senegal

Executed Services

    • Client is operating Senegal oldest and largest Phosphate Mine. under investing in order to increase the mine’s output capacity
    • Two additional deep wells with high yields were awarded to BAUER, to serve the mine’s phosphate extraction process.

Characteristics / Technical Data

    • Well design with 14" pump chamber (steel) and 6" lost liner section (stainless steel)
    • 2 ea. Boreholes with direct-flush and airlift drilling methods
    • Ø 26" (660 mm) to 12 m
    • Ø 23" (584 mm) to 90 m
    • Ø 17-1/2" (444 mm) to 130 m 
    • Ø 12-1/4" (311 mm) to 450 m

Rigs: 1 x RB40